bottom glued on the hull.
waiting for the glue
dry fitting of the bottom
checking the bevels of the chine logs and the bulkheads after planing them.
the hull assembled with gunwales. Still a dry run
the assembly of the hull
the centre board case: a dry run before glueing
the centre board
Butt straps on the bottom
Here I am again: still working on the GIS, though progress is quite slow.
Situation: hull completed (hull, bulkheads and bottom), most parts ready (mast, boom, yard, rudder, rudder blade, centreboard, centre board case), epoxied or glassed.
here are some pictures:
No comments:
Post a Comment